Mirvac Tower forms part of the Cathedral and Treasury precinct and is a focal point in Perth’s CBD rising 33 storeys above St George’s Terrace. The building combines contemporary design with state of the art substainability technology and is the first office building in Perth to feature a trigeneration plant. The tower has a rentable area of approximately 30,600 square metres with the Supreme Court of Western Australia being one of the major tenants.
Within our scope we were tasked with the design and construct contract for all Wet Fire services and Fire Detection services for the project:
- A fully compliant Fire Sprinkler system to AS2118.1 (Annexure Building & Law Chambers Underground Car Park)
- A fully compliant Fire Hydrant system to AS2419 (Annexure Building & Law Chambers Underground Car Park)
- A fully compliant Fire Hose Reel system to AS2441 (All areas)
- A fully compliant combined Fire system to AS2118.6 (MIRVAC Tower only)
- Fully compliant portable extinguishers to AS2444.
A fully compliant Fire Detection system to AS1668.1 and emergency warning intercommunication systems to AS1670.4
The systems were required to provide full coverage to all areas of all the buildings constructed as part of the contract including from Basement level through Podium level, to Level 33 (Roof) of the Tower including the Basement through to the Podium to Level 5 (Roof) of the Annexure Building.
Protection was also required to be provided to both levels of the communicating Law Chambers underground car park at the adjacent Church House and new City of Perth
Library contracts which were being built by other contractors. This system was completely separate to that of the MIRVAC Tower & Annexure and was therefore be supplied from a different water supply.
The fire system within the MIRVAC Tower & Annexure Building was supplied via a shared water supply which was constructed as part of this installation contract. This also provided water supply to the adjacent Treasury Hotel and the Annexure building.