The Perth Market Authority (Market City) located in Canning Vale was originally developed in 1989 and is located on 51 hectares of land. Market City plays a critical role in the marketing and distribution of fresh produce in Western Australia. Some of the key features the market offers includes access to world class central market infrastructure, a customer base of approximately 600 buyers, which includes major supermarkets and food caterers.
Within our scope for this project we were tasked with the design and construct contract for the Wet Sprinkler and Dry Sprinkler Fire services including new valve sets and DBA monitoring:
- A fully compliant Wet Fire and Pre-action system in accordance to AS2118.1, NFPA 13 and FM Global Data Sheet 2-0 for ESFR sprinklers.
The project consisted of the installation of 15 x High hazard sprinkler systems and 14 x Pre Action Sprinkler systems to 120,0000m2 of existing operating warehouses used for the distribution of fresh produce to retailers and the general public.
The fire systems were required to be provided throughout the 3 x Western warehouses from W1 through to W3, the 7 x Eastern warehouses from E2 through to E7 including the Loscam warehouse and also the Central Trading area (CTA).
The fire systems within these areas consisted of high level roof sprinklers, low level sprinklers, office sprinklers and pre-action (dry) systems in the cool room and freezer areas.


